The Critova blog: project management, explained

Practical articles on planning, scheduling, cost, risk and running a PMO, written in plain words with worked examples and templates you can use today.

Project management basics

How to choose project management software for your team

A seven-step method for choosing project management software: define your work level, set must-haves, run a real trial and score tools with weights.

Read

Project charter template: what goes in it, with a filled-in example

What goes in a project charter: a section-by-section template table, a filled-in example, the steps to write and sign one, and the mistakes to avoid.

Read

Project closure checklist: how to close a project and capture lessons learned

A practical project closure checklist: acceptance, handover, financial close, archiving and a lessons learned session, with a template and an example.

Read

How to run a project kickoff meeting: agenda, checklist and example

How to run a project kickoff meeting: a 60-minute agenda, a preparation checklist, a worked example, common mistakes and the follow-up actions.

Read

Project status report template: what a weekly or monthly report should contain

What a project status report should contain: a one-page template, RAG rules, a worked example with CPI and SPI, and the mistakes that make reports useless.

Read

What is a RACI matrix, and how do you make one?

What a RACI matrix is, what R, A, C and I mean, how to build one in six steps, a worked product launch example table, and the checks that catch mistakes.

Read

What is project management, and what does a project manager actually do?

What project management is, what a project manager does each week, the five stages of a project, and a worked example with real numbers you can copy.

Read

How to build a work breakdown structure (WBS), with an example

How to build a work breakdown structure: the 100% rule, how deep to go, a full WBS example tree with numbering, a WBS dictionary and common mistakes.

Read

Scheduling

What is the DCMA 14-point schedule assessment? All 14 checks in one table

The DCMA 14-point schedule assessment explained: all 14 checks with their usual thresholds, how to run them, a worked example and how to fix failures.

Read

What is a Gantt chart, and how do you make one that stays useful?

What a Gantt chart is, its parts, how to build one step by step with dependencies, a worked example with the critical path, and how to keep it useful.

Read

Look-ahead schedule: what a three-week look-ahead is and how to run one

What a three-week look-ahead schedule is, how it links to the master schedule, and a weekly routine with a worked example, a template table and common mistakes.

Read

What is a project milestone, and how many should a plan have?

What a project milestone is, the main types, how many a plan needs, a worked milestone plan for an office move and how to track milestones honestly.

Read

What is a project baseline, and when should you re-baseline?

What a project baseline is, how to set one, how to measure variance against it, and clear rules for when to re-baseline, with a worked example.

Read

Crashing vs fast-tracking: how to shorten a project schedule

Schedule compression explained: crashing vs fast-tracking, how to pick activities by cost slope, a worked crashing example checked by hand and the risks.

Read

Task dependencies explained: FS, SS, FF and SF, with lags and leads

Task dependencies explained with examples: the four link types FS, SS, FF and SF, how lags and leads work, a worked schedule and the mistakes to avoid.

Read

Total float vs free float: the difference, the formulas and a worked example

Total float vs free float in plain words: both formulas, a six-activity worked example checked by hand, and the common mistakes that mislead planners.

Read

Cost and earned value

Risk

PMO and portfolio

Methods and industries