Glossary
Project controls glossary, in English and Arabic
Thirty-one terms from scheduling, cost control and risk, each with a one-line definition and its Arabic equivalent.
Terms
- Activityالنشاط
- A piece of work in a schedule with a duration, a start and a finish.
- Actual cost ACالتكلفة الفعلية
- What the work done so far has cost.
- Baselineخط الأساس
- The approved copy of the schedule and budget that progress is measured against.
- Budget at completion BACالميزانية عند الإنجاز
- The total approved budget for the project.
- Change requestطلب التغيير
- A formal proposal to change scope, budget or dates, which is approved or rejected.
- Constraintالقيد
- A fixed date placed on an activity that limits when the logic can schedule it.
- Cost performance index CPIمؤشر أداء التكلفة
- Earned value divided by actual cost. Below 1.0 means over budget.
- Critical pathالمسار الحرج
- The longest chain of linked activities. It sets the finish date, and its activities have no float.
- Critical path method CPMطريقة المسار الحرج
- The calculation that finds early and late dates, float and the critical path.
- Criticality indexمؤشر الحرجية
- The share of simulation runs in which an activity was on the critical path.
- Data dateتاريخ البيانات
- The date up to which progress has been recorded. Remaining work is scheduled after it.
- DCMA 14-point assessment DCMA-14تقييم DCMA ذو الأربع عشرة نقطة
- Fourteen checks of schedule quality, such as missing logic, long lags and hard constraints.
- Earned schedule ESالجدول المكتسب
- The point in the plan at which today's earned value should have been reached, measured in time.
- Earned value EVالقيمة المكتسبة
- The budgeted value of the work actually completed.
- Earned value management EVMإدارة القيمة المكتسبة
- A method that compares planned value, earned value and actual cost to measure performance and forecast.
- Estimate at completion EACالتقدير عند الإنجاز
- The forecast total cost of the project, based on performance so far.
- Free float FFالفائض الحر
- How far an activity can slip before it delays the next activity.
- Gantt chartمخطط جانت
- A bar chart of activities against time, with links between them.
- Lagالتأخير
- A wait added to a link between two activities. A negative lag is a lead.
- Milestoneالمعلَم
- A zero-duration point that marks an event, such as an approval or a handover.
- Monte Carlo simulationمحاكاة مونت كارلو
- Running the schedule many times with durations drawn from ranges, to get a range of finish dates.
- P50 and P80P50 وP80
- The dates that 50% and 80% of simulation runs finished on or before.
- Planned value PVالقيمة المخططة
- The budget for the work that should be done by a given date.
- Portfolioالمحفظة
- A group of projects managed together to meet an organisation's goals within its budget.
- Project controlsضبط المشاريع
- The discipline of planning, measuring and forecasting a project's schedule, cost and risk.
- Project management office PMOمكتب إدارة المشاريع
- The team that sets standards, reports on the portfolio and supports project managers.
- Risk registerسجل المخاطر
- The list of identified risks with probability, impact, owner and response.
- Schedule performance index SPIمؤشر أداء الجدول
- Earned value divided by planned value. SPI(t) is the time-based version from earned schedule.
- To-complete performance index TCPIمؤشر الأداء اللازم للإنجاز
- The cost efficiency needed on the remaining work to finish on budget.
- Total float TFالفائض الكلي
- How far an activity can slip before it delays the project finish.
- Work breakdown structure WBSهيكل تجزئة العمل
- The tree that breaks the project's scope into deliverables and work packages.