Free during our launch: every feature, every plan, until 31 March 2027.

See the offer

Free template

RACI matrix template (free Excel download)

List deliverables down the side and roles across the top, then mark R, A, C or I. The last column warns you when a row has no Accountable person or more than one.

Updated · 2 min read

Download

Download the Excel template النسخة العربية

Free, no sign-up. .xlsx, 8 KB. Opens in Excel, Google Sheets, Numbers and LibreOffice.

What is inside

List deliverables down the side and roles across the top, then mark R, A, C or I. The last column warns you when a row has no Accountable person or more than one.

Deliverable or decisionFree text.
SponsorPick from a drop-down: R, A, C, I, A/R
Project managerPick from a drop-down: R, A, C, I, A/R
Design leadPick from a drop-down: R, A, C, I, A/R
FinancePick from a drop-down: R, A, C, I, A/R
ProcurementPick from a drop-down: R, A, C, I, A/R
OperationsPick from a drop-down: R, A, C, I, A/R
CheckCalculated for you.

Example rows show what good entries look like. Overwrite them, and add rows as you need; the formulas copy down.

How to use it

  1. Put deliverables and decisions down the side and roles across the top (rename the role headers).
  2. Pick R, A, C or I from the drop-down in each cell.
  3. Fix every row the Check column flags: each one needs exactly one A.

The full method, with a worked example, is in this article.

When a spreadsheet stops being enough

A spreadsheet works for one project and one person. Once several people update it, or you need the numbers on a dashboard, copies drift apart. Critova has project teams, roles and access per project, shared by the whole team and free during the launch.

Common questions

Is it really free?

Yes. Download it, change it and use it at work. No sign-up and no email address needed.

Does it work in Google Sheets?

Yes. Upload the .xlsx to Google Drive and open it with Google Sheets; the formulas and drop-downs keep working.

Is there an Arabic version?

Yes. Every template comes in English and in Arabic, and the Arabic file is laid out right to left.

Bring one schedule. See your critical path in an hour.

Free during our launch until 31 March 2027.